Acme Solar Holdings has successfully commissioned the third phase of its Battery Energy Storage System (BESS) project in Rajasthan, achieving a capacity of 19 MW / 40.50 MWh.
The project, located in Sanwara and Mehar Nagar, Jaisalmer, is managed by Acme Suryodaya Private Limited, a wholly owned subsidiary of Acme Solar. With this development, the total commissioned capacity of the project has reached 76 MW / 160.50 MWh out of the planned 285 MW / 601.904 MWh. The commercial operation date for this phase is set for 13 March 2026.
Disclaimer: This article is based on a regulatory filing submitted to the National Stock Exchange of India (NSE).