Texmaco Rail & Engineering Limited has secured a ₹27.67 crore contract (inclusive of GST) from South Western Railway for comprehensive annual maintenance and breakdown restoration of Overhead Equipment (OHE) and power supply installations across the Mysore Division.
The order, valued at approximately ₹23.45 crore excluding GST, covers 1,046 track kilometres (TKM) of electrification infrastructure along with associated electrical assets. The contract will be executed over a period of 24 months from the date of issuance of the Letter of Acceptance.
Under the scope of work, Texmaco Rail will carry out routine, preventive and emergency maintenance to ensure reliable and uninterrupted traction power supply operations across the Mysore Division. The mandate includes upkeep of OHE systems and power supply installations critical to the smooth functioning of electrified railway routes.
With this latest win, the company’s cumulative OHE and power supply maintenance portfolio has expanded to 3,702.62 TKM across multiple railway divisions and corridors under Indian Railways. The portfolio also includes projects in the Bengaluru Division and select sections of the Dedicated Freight Corridor Corporation of India Limited (DFCCIL), strengthening Texmaco Rail’s presence in railway electrification and maintenance services.
The order has been awarded by a domestic entity and does not fall under related party transactions. The company has confirmed that neither the promoter nor the promoter group has any interest in the awarding authority.