Suzlon Group has announced a new order win for the development of an 81.9 MW wind energy project for Oyster Green Hybrid One. The project will be located in Agar, Madhya Pradesh.

The order includes the installation of 26 Wind Turbine Generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower, each with a rated capacity of 3.15 MW. These turbines belong to Suzlon’s larger rated 3.15 MW, S144-140m turbines from the 3 MW product series.

Under the agreement, Suzlon will supply the wind turbines and oversee the project’s execution, including erection and commissioning. Additionally, the company will provide comprehensive operations and maintenance services post-commissioning.

As of 10:50 am the shares were trading 1.10% lower at ₹44.90 on NSE.

TOPICS: Suzlon