
GR Infraprojects Ltd. has received a Letter of Acceptance (LoA) from the National Highways Authority of India (NHAI) for a significant road infrastructure project. The contract, valued at ₹4,262.78 crore (inclusive of GST), involves the development and improvement of the Agra-Gwalior Greenfield Highway under the DBFOT (Design, Build, Finance, Operate, and Transfer) model at BOT (Toll) mode.
Project Details
- Section 1: Construction of a six-lane access-controlled highway from Deori (Agra, UP) to Susera (Gwalior, MP), covering 88.4 km across Uttar Pradesh, Rajasthan, and Madhya Pradesh.
- Section 2: Overlay, strengthening, and road safety enhancements on the existing NH-44 Agra-Gwalior section (1058 km to 1148 km, or design chainage 13.00 to 103.00).
Completion Timeline
The project will be completed within 910 days from the appointed date.
This contract strengthens GR Infraprojects’ presence in the road construction sector, reinforcing its expertise in executing large-scale highway projects. The company will provide further updates on project progress as developments unfold.