Larsen & Toubro Construction’s Power Transmission & Distribution business has recently secured significant orders in the Middle East region. In the United Arab Emirates (UAE), the company received an order for a 400/132kV Substation. This involves the entire process from engineering and supply to construction, installation, testing, and commissioning. Additionally, the scope includes providing a Transformer, Reactor, and Substation Control and Monitoring Systems (SCMS).
Simultaneously, in Kuwait, Larsen & Toubro Construction won an order for establishing 400kV Overhead Transmission Lines, along with associated 400kV Underground Cable interconnections. “The scope also includes associated Transformer, Reactor and Substation Control and Monitoring Systems (SCMS).In Kuwait, the business has won an order to establish 400kV Overhead Transmission Lines along with associated 400kV Underground Cable interconnections. This transmission segment of more than 100 km route length will help evacuate and generate power,” the company said in the filing.
TOPICS:
Larsen & Toubro                
 
 
              