Exicom Tele-Systems has commenced regular commercial production at its newly established manufacturing facility in Telangana as of March 16, 2026. The plant is located in the EHMC Non-SEZ Area, Raviryala Village, Maheshwaram Mandal, Ranga Reddy District, Hyderabad.
The Telangana plant is designed to enhance Exicom’s manufacturing capacity to meet increasing market demand. It will focus on the production and assembly of EV battery charging stations, EV chargers, Li-ion battery packs, SMPS (DC power systems), and other products involving power electronics and IoT integration. This development follows the successful completion of trial production, which was initiated in November 2025.
Disclaimer: This article is based on a regulatory filing submitted to the National Stock Exchange of India (NSE).
This article is written by Business Desk and reviewed by Aman Shukla before publication.