Trident Ltd. has successfully expanded its solar power capacity at its Budhni facility in Madhya Pradesh. The company has commissioned an additional 11.02 MWp rooftop solar power project, bringing the total installed capacity at the facility to 51.92 MWp.

This expansion is part of Trident’s commitment to sustainability and renewable energy adoption. The newly added capacity comprises two rooftop projects of 6.58 MWp and 4.44 MWp, which were commissioned on March 29, 2025. The project, developed with an investment of ₹28 crore, has been financed through internal accruals, reflecting the company’s strong financial position and dedication to eco-friendly initiatives.

Key Highlights:

  • Existing Solar Capacity: 40.9 MWp (100% utilized)

  • New Capacity Addition: Two rooftop projects totaling 11.02 MWp (6.58 MWp + 4.44 MWp)

  • Commissioning Date: March 29, 2025

  • Investment: ₹28 crore (funded through internal accruals)

  • Objective: Reduction in carbon footprint through renewable energy adoption

With the existing 40.9 MWp capacity already operating at full utilization, this addition further strengthens Trident’s renewable energy portfolio. The initiative aligns with the company’s broader objective of reducing its carbon footprint and promoting sustainable energy solutions.

TOPICS: Trident