PNC Infratech has recently informed the exchanges that it received an order worth Rs 380 crore from NHAI for the construction of an additional 3-lane Bridge over River Ganga to connect Buxar and Bharauli on NH-922 in Uttar Pradesh and Bihar on Hybrid Annuity Mode (HAM).
In the exchange filing, the company shared, “Our Company has been declared Ll (First Lowest) bidder in a highway cum bridge project namely Construction of additional 3-Lane Bridge over River Canga for connection between Buxar and Bharauli on NH-922 in the State of Uttar Pradesh and Bihar on Hybrid Annuity Mode (HAN) on 27 .08.2024 for a Bid Project Cost of Rs. 380.0 crore (Rupees Three Hundred Eighty Crore).”
As per the filing, the construction period is 910 days and the operation period is 15 years post construction.
 
 
          